You must be a CTBUH Member to view this resource.
Urban Workshop Lonsdale
2 Lonsdale Street, Casseldon Place 2
Building
Completed
2005
Office
Concrete-Steel Composite
4 Star Green Star
150 m / 492 ft
34
54,000 m² / 581,251 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 September 2015 - Event
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy