text
Buildings | CTBUH Skyscraper Center
Buildings by Escritorio Tecnico Julio Neves

Status   Completed  Topped out  Construction  Constr. Stopped  Proposed  Vision  Demolished 

#

Building Name

City

Height (m)

Height (ft)

Floors

Completed

Material

Use
1. Limantos   Sao Paulo (BR)   158  518  41   2011  concrete   residential
1. Ipes   Sao Paulo (BR)   158  518  41   2009  concrete   residential
1. Zineas   Sao Paulo (BR)   158  518  41   2009  concrete   residential
1. Begonias   Sao Paulo (BR)   158  518  41   2008  concrete   residential
1. Jabuticabeiras   Sao Paulo (BR)   158  518  41   2008  concrete   residential
1. Magnolias   Sao Paulo (BR)   158  518  41   2008  concrete   residential
1. Reseda   Sao Paulo (BR)   158  518  41   2008  concrete   residential