You must be a CTBUH Member to view this resource.
Galleria Palace Tower A
Building
Completed
2003
Residential
149.6 m / 491 ft
46
5
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
20 October 2003
Jong Soo Kim, Song Mun Yoo & Dong Whan Kim, C S Structural Engineering
This paper presents the structural design and analysis of the Galleria Palace. As a residential development, this building is located at Jamsil district, Seoul, Korea....
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy