You must be a CTBUH Member to view this resource.
Huanghe River Center Building
Building
Completed
2009
Office
All-Concrete
230 m / 755 ft
62
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
01 February 2021
Sujatha Manoj, Mott MacDonald Group; Deepankar Choudhury, Indian Institute of Technology (IIT) Bombay; Akash Sharma, Fugro
Large-diameter piles and barrettes are the two most common foundation types for tall buildings in the Middle East region, where ground conditions are challenging due...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy